WPL Diamond DMS3 Sewage Treatment Plant (5 -11 People)

The WLP Diamond DMS3 Package treatment plant is suitable for a domestic 9 bedroom house or 2 x 3 bedroom houses. Coming with a free alarm system and external blower box it’s a great choice for home owners looking to upgrade their septic tank or for new installations.

Free Delivery to UK Mainland – Excludes Highlands and Islands

Lead Time: 1 to 2 weeks

We will contact you upon order to arrange a suitable day for delivery.

To get a delivery date prior to ordering, call us on: 01844 877030

£2,579.00 Excl. VAT

WPL: Turret Extension (460mm)

The 460mm turret extension allows the WPL Diamond to be installed at a deeper level.

Lead time: 1 week

WPL: Final Effluent pump chamber

The WPL External pumping chamber (EPC) is used when no gravity discharge is possible from a sewage treatment plant. It features a high level alarm and flashing beacon as standard.

Lead time: 1 week

SKU: 1300-0002