The SOLIDO Sewage Treatment Plant is one of our most popular treatment plants for residential installations. Silent, well-engineered and with very low power consumption, it’s one of the best on the market.
The method of treating water in batches helps to lower final power consumption and stabilise final effluent quality. Water stored in the primary chamber is moved to the reactor chamber every six hours for treatment.
This method is widely seen as a more efficient process for treating waste, and is better able to cope with fluctuating usage (parties etc).
Being one of the only tanks made in one piece, and from Polyethylene, it has a 25 year warranty and does not require concrete to install. This allows for long term ground movement without risk of the tank splitting. Over a 25 year period the SOLIDO is a very cost effective solution.
Owls Hall can install your SOLIDO sewage treatment system with the highest possible expertise. Not using concrete saves time and money and causes less disruption to your garden.
If you choose Owls Hall to install your SOLIDO, and take out a service plan with us, we will provide a 5 year warranty for your peace of mind.
We have three installation packages suitable for installation of Solido sewage treatment plants, all of which are designed around value for money and minimising disruption.
You can view how the SOLIDO compares to other systems using our comparison table here.
Download Solido Guides and Manuals